• Tight deadline further skewed by expected events
• Whole premises air-conditioning requirement
• Restricted plant space / noise control concerns
• PERFORMANCE
• PRESTIGE
• COMFORT / ENVIRONMENTAL

A 10th anniversary project to completely refurbish the existing Dishoom restaurant and extend into the adjoining (vacated) ‘Jamie’s Italian’ thereby doubling the footprint to reimagine this largest-ever Dishoom flagship.
To provide a comfortable environment for both staff and customers…including those queueing outside!
To provide a durable, energy-efficient solution within an existing footprint which adhered to all the stringent local planning conditions and constraints.

At the start of the contract in November 2019, we could only access the roof, the risers and the adjoining vacated space as Dishoom remained open until New Years Eve.
Organising the closure of one of London’s busiest tourist thoroughfares.
Full strip-out began in January 2020 but this uncovered a number of unexpected obstacles which required a fundamental re-evaluation and rejig of the original designs. Covid-19 restrictions would ultimately delay project completion until November 2020.
Dishoom wanted air-conditioning throughout.
For the kitchen, it was important to be able to combat the extremely high temperatures generated in the cooking process and so provide a comfortable working environment for their staff.
Similarly, in the Restaurant, the brief called for a consistent, pleasurable dining experience irrespective of whether it was the hottest summer day or the middle of winter.
Noise mitigation both during the refurbishment and future-proofing of the restricted riser spaces with attenuation and insulation for when the restaurant became operational.

KITCHEN AIR-CONDITIONING
A Direct eXpansion (DX) evaporator coil was located in the ceiling void on the ground floor – with ducting down to the basement kitchen – thereby ensuring that no air-conditioning equipment was located within the kitchen itself, so avoiding any grease contamination.
Comfort cooling was supplied to the kitchen from a full fresh-air rooftop Air Handling Unit comprising filters, DX cooling & heating, an efficient gas-fired heater and fan.
The ambient temperature could therefore be accurately controlled via a series of room sensors located within the kitchen.
KITCHEN EXTRACT SYSTEM
Caswell manufactured bespoke kitchen extract canopies to satisfy the extreme demands of a very busy kitchen.
RESTAURANT AIR-CONDITIONING
We installed a Variable Refrigerant Flow (VRF) system which circulates only the minimum amount of refrigerant needed during a single heating or cooling period.
This mechanism allows Dishoom to independently control several A/C zones.
All the Restaurant areas on the ground floor and basement were served by this VRF system via fan-coils located throughout each level. The VRF units themselves were located at roof level. As there was limited head space in certain parts of the restaurant, the ducts were creatively designed to run within false beams.
This actually enhanced the nostalgic Art Deco ambience rather than detracting from it.
To meet the requisite cooling demand – even on the hottest days – the fresh air supply into the fan-coil units can be accurately chilled via DX cooling coils.
Conversely, to counter any unwanted chilly drafts entering through external doors in the evening or colder months, they were equipped with overdoor heaters which also feed off the same VRF system.
The status of the Restaurant Air-Conditioning throughout the whole premises can be overseen and centrally-controlled from a master panel in the Manager’s office.
This design, with its multiple features and benefits, not only met the Client’s demanding brief but did so in a cost-effective manner.
NOISE CONTROL
Potential future noise issues with private residences above the restaurant were mitigated by the provision of attenuation on the roof and in all risers.
The existing risers had to be used and despite the very limited space available – and restricted working hours – the desired result was achieved.
CONTROL SYSTEM
Caswell provided a comprehensive addressable control system to operate all the HVAC systems in the building.
Its addressable nature allows for remote monitoring and provides the facility to perform quick and easy fault-finding off-site.
INSTALLATION WORKS
Caswell’s Project Manager arranged the necessary permissions and organized a full road closure for a 6-storey crane lift of AHUs, kitchen extract fans and A/C condensers.
This was successfully completed in what is one of the busiest areas of London.
The roof trellis structure – which was removed to facilitate a safe lift – was then replaced with a newly-designed and more substantial timber structure.
ROOF DESIGN SHOWCASING THE NEW TRELLIS STRUCTURE AND PLANT LAYOUT








PERFORMANCE
Caswell designed an effective, energy-efficient HVAC system around a bespoke specification to meet the client’s exacting requirements.
This will provide them with a high level of performance, flexibility and durability for many years to come.
PRESTIGE
It was an privilege for us to be chosen to work on Dishoom’s flagship restaurant which – being situated in the heart of London’s West End in the City of Westminster – is a destination venue for both tourists and London’s society alike.
Aside from being a popular dining experience, Dishoom also earns kudos for its excellent record on social responsibility.
COMFORT / ENVIRONMENTAL
Restaurant diners expect – and staff deserve – a comfortable environment.
Our air-conditioning system design incorporated multi-stage heating and cooling systems which can instantly react as demand increases or decreases due to customer footfall, staff numbers, cooking activities and local weather conditions.
Accurate control of kitchen temperature provides the optimum conditions for staff and so enables them to fully concentrate on their busy roles in the preparation of quality food.
Similarly, the restaurant can be maintained at the ideal temperature for a pleasant dining experience whatever the weather…even on the hottest days of the year.
Although sized to ensure that it can always cope with the considerable demands which may be placed upon it, the system employs intelligent management to minimise energy consumption.


Design • Manufacture • Installation • Commissioning & Certification
Caswell co-ordinated a whole host of HVAC-related products and services to enable the objectives and stated challenges to be met.
Here’s a list of the key elements with which we were involved:
DW144 / DW172 ductwork
Kitchen Exhaust Attenuation
Kitchen Extract Fan
Kitchen Supply Fan c/w Electric Heater Battery
Air-Conditioning :
Rooftop AHU c/w DX coils and Gas-fired Heater Battery
Supply fan c/w DX coil
VRF System c/w 5x Fan coils
Door Air Curtains
Dedicated, standalone A/C system for IT Server
Crane Lift Management
HVAC Control Panel and BMS
Commissioning
Click to view / download the PDF version