Caswell Case Study
Deliveroo ‘Editions’

‘EDITIONS’ COMMERCIAL KITCHENS HUB – ONE BUILDING, NINE RESTAURANT KITCHENS

CASWELL CLIENT : Deliveroo

MAIN CONTRACTOR : The Yorkshire Maintenance Co. (Hull) Ltd

DESIGNER : Caswell

ARCHITECT : LBF Architects

MEP CONSULTANTS : Caswell

IMPACT ASSESSMENTS : Sharps Redmore / M.Bull & Associates

CHALLENGES:

 

• Extensive plant & services in very limited footprint

• Tight installation timeline programme

• Delay due to unexpected asbestos material handling 

 

KEY BENEFITS / DRIVERS:

 

• PERFORMANCE

• ACCURACY

• ENVIRONMENTAL

Speech bubble icon
 

“Deliveroo Editions provides bespoke, fully-equipped, state of the art commercial kitchen units which are licensed and occupied by new and established restaurant partners.
This regenerates the local area and kitchen space is in high demand”

 

Deliveroo

Arrow in target icon

OBJECTIVES

 

To manufacture, supply and install multiple (9) independent commercial kitchens with associated services in an existing, single-storey confined space.   

 

To meet client expectations of completion within the ambitious timeline required.

 

To employ technological counter-measures in mitigation of local environmental concerns regarding odour and noise control.              

Challenges icon

CHALLENGES

 

To ensure all kitchen extract systems had adequate personnel cleaning access and that all equipment – including roof plant – could be safely installed and subsequently fully maintained despite the very limited footprint.   

 

The proposed 10-week installation programme to provide nine independent, fully-equipped kitchens was ‘tight’ by normal restaurant industry standards.    

       

An unexpected need for asbestos control measures by the Main Contractor reduced available installation time even further.

 

drawing icon

LEFT : Caswell’s internal layout solutions met the challenge of fitting an extensive inventory of plant and services into the existing limited space…and an equally compact roof layout

Light bulb icon

SOLUTIONS

 

Caswell’s 50+ years of experience and CAD/CAM expertise was gainfully employed in carefully positioning ductwork and services within the planned layout.

Installation proved challenging given the limited space in which to work and meticulous management of deliveries and site logistics was also needed due to the lack of on-site storage.

 

Knowledge of BS EN 15780 and TR/19 Standards plus early engagement with ductwork cleaning contractors was crucial in planning suitable access from the outset and arranging for an on-site survey during the installation.

 

Kitchen canopies were delivered to site in two halves along with a pot-wash condensate canopy for each independent restaurant station.
These were assembled in-situ, so phased daily deliveries of canopies were proposed to negate storage issues on site.

As usual, our skilled and industrious installation team worked diligently to keep pace. As soon as kitchen walls were built they were – to quote the Main Contractor – “straight in there”.   

 

The repurposing of an old, dilapidated building which had been vacant for 7 years is a commendable environmental approach; however, it is not without certain issues. An unexpected need for asbestos control measures by the Main Contractor prior to any installation works – and no programme extension – reduced the available installation time even further. 

 

Our solution?
We proved our commitment and flexibility by allocating additional people and working extra hours to ensure that the project was delivered on schedule…the original schedule.

PERFORMANCE ICON

ACCURACY ICONENVIRONMENTAL ICON

 

 

 

KEY BENEFITS

 

PERFORMANCE

As a single site hosting multiple restaurateurs with varying cuisines, this project demanded our usual technical and practical attention to detail coupled with a masterclass in HVAC system performance engineering.

 

ACCURACY
All works were fully considered, designed and executed with the expertise and professionalism our Clients expect but in a much more concentrated form.

Accuracy was (even more) critical due to the specific nature of this project, where minimal space demanded perfect ergonomics. 

 

ENVIRONMENTAL
Noise and odour control concerns were addressed at early planning stage to ensure our systems complied with both national and local regulations and pre-empt any concerns from local residents or businesses.

 

The building’s refurbishment for reuse was in itself both lower in carbon footprint than a traditional newbuild and clearly far less than the combined carbon footprint of nine commercial kitchens in separate locations.

 

Its raison d’etre of being a hub for many different brands gives the significant, ongoing benefit of avoiding the need for food couriers to travel greater distances to-and-fro between various locations in the city.  

 

An unforeseen but welcome bonus is the removal of fibrous asbestos materials from the locality.

icon of CAD screen P&S workman orange icon installation iconcompliance clipboard and rosette orange icon

 

 

 

SCOPE OF WORKS

Design • Manufacture • Installation • Commissioning & Certification

 

 

PRODUCTS & SERVICES 

Caswell co-ordinated a whole host of HVAC-related products and services to enable the objectives and stated challenges to be met.
Here’s a list of the key elements with which we were involved:

 

DW144 Ductwork                              
Filter Housings & Filter Media                                  
Kitchen Extract and Supply Fans
Kitchen Supply Heat Exchangers        
Kitchen Canopies
           
Actuated Smoke Dampers                  
Volume Control Dampers                   
Minor Supply and Extract Fans           
Heater Batteries                                             
Thermal Insulation and Cladding                   
Louvres        
                                                   
HVAC Control Panel / BMS
Commissioning    

 

 

    PDF_file_icon.svg

Click to view / download the PDF version   

 

 

 

 

Deliveroo Logo    

Curious about Deliveroo’s ‘Editions’? Read more HERE   

Caswell
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.